The extended boat ramp on Jethou Island required a highly specialised approach due to the island's remote location and challenging below tide line position. Matt de Garis designed the ramp to accommodate both the island’s steep landscape and the practical need for smoother transportation of materials and supplies. This project demanded not only a creative design solution but also precision in execution, as the ramp had to withstand the harsh coastal environment while offering a reliable means of access to the island.
What makes this project stand out is its sheer complexity and the resourcefulness required to complete it. By engineering a structure that blends durability with ease of use, MAT delivered a solution that enhances the island’s logistics without disrupting its natural beauty. This project exemplifies the team's ability to tackle unique and demanding challenges with precision and sheer ingenuity.